PC-Control: Full-load test stand ensures smooth commissioning of offshore wind turbines

80 total M5000 wind turbines for “Global Tech I” offshore wind farm

load test stand which Areva uses to subject their wind turbines to extensive tests, also features PC- and EtherCAT-based control technology from Beckhoff. Areva uses the facility to test their wind turbines for the “Global Tech I” project, located in the German part of the North Sea, approx. 180 kilometres from Bremerhaven, at a water depth of 40 metres.

  Description Language Type Date Size Ver. Status
members-no PC-Control: Full-load test stand ensures smooth commissioning of offshore wind turbines EN PDF Aug 24, 2016 0,53 MB